Construction Docs
Class 1 - Residential System
Class 1 - Residential System
Couldn't load pickup availability
System and processes tailored for Class 1 Residential construction projects aimed at improving the overall Safety, Quality and Commercial facets of delivery in a simplified form:
Commercial Management System
A. SOW for the following trades:
1. Early Works
1.1. Early works
1.2. Demolition
2. Structure
2.1. Concrete Supply and Place
2.2. Formwork
2.3. Structural Steel
3. Services
3.1. Electrical Services
3.2. Hydraulic Services
3.3. Mechanical Services
3.4. Pool Services
4. Façade-Roofing-External
4.1. Balustrades and Metalwork
4.2. Box Gutters
4.3. Glazing – Windows
4.4. Landscaping
4.5. Masonry
4.6. Render
4.7. Roof Safety
4.8 Roofing & Cladding
5. Finishes
5.1. Carpet
5.2. Doors and Frames
5.3. Joinery
5.4. Painting
5.5. Partitions and Ceilings
5.6. Shower Screens
5.7. Tiling and Stone
5.8.Timber Flooring
5.10. Waterproofing
6. Preliminaries
6.1. Final Clean
6.2. Scaffolding
6.3. Surveying
B. Delivery
3.1. Progress Claim Assessment Template
3.2. Variation Approval Template
3.3. Variation Dispute
3.5. Subcontractor Trade Card
3.6. Short form Agreement – provided by Maddocks Lawyers
Safety Management System
1. Pre-Commencement
1.1. HSE Plan
1.2 Safety Policies
2. Delivery
2.1. Induction Record
2.2. Induction Register
2.3. Site sign in Register
2.4. Visitor Register
2.5. Tool-box talk
2.6. Pre-start Meeting
2.7. SWMS Review HRCW
2.8. Task Observation
2.9. Hazard Inspection
2.10. Powered Mobile Plant Checklist
2.11. Mobile Major Plant Register
2.12. Tower Crane Commissioning Checklist
2.13. Electrical Plant Equipment Register
2.14. Lifting Gear Register
2.15. SDS Register
2.16. Concrete Cutting Core Drilling Permit
2.17. Hot Works Permit
2.18. Confined Space Permit
2.19. Permit to Excavate
2.20. Permit for Work at heights
2.21. Shutdown Checklist
2.22. Nurse Call Test Record
2.23. Fire Protection Register
2.24. Injury Reporting
2.25. Incident Report
2.26. Witness Statement
2.27. Medical Referral
2.28. Return to Work plan
2.29. Project Evacuation Drill Register
2.30. PPE Register
Quality Management System
1. Pre-Commencement
1.1. Quality Management Plan
2. Inspection Test Plans:
All ITPs are provided through Iauditor, which can be accessed through IOS or android.
1. Waterproofing
1.1 Bathrooms
1.2 Miscellaneous – Podiums, Terraces, Balconies
1.3 Waterproofing - Planters
2. Structure
2.1 Suspended Elements
2.2 Vertical Elements
2.3 Slab on Ground
2.4. Structural Steel
3. Finishes and Services
3.1 Internal finishes
4. Facade
4.1 Glazing
4.2 Stone
4.3 Brickwork
5. Civil Works
5.1 Piling
3. Defect Management
3.1. Defect Management Process
3.2 Defect Register Template
4. Quality Policy
Additional Notes:
Training Included – 1 workshop - 2 hrs duration
All documentation is branded with your company branding.
Share

